CUSTOMER TESTIMONIAL: EV CHARGING FOUNDATIONS INSTALLED IN CARDIFF, WALES

“I would give these a 5-star rating!

Using these bases means we can potentially be on-site on the same day or the day after the groundworkers, without the need to wait for the concrete to set. Also, when future-proofing, we can put a blank plate on top, hide the ducting route within the base, and cause no trip hazards. Being able to drill the base tops to the design of the charger base is a bonus as well.”

-Ryan Wright​​​​, EV Project Manager, EML Electrical Contractors Limited 

Previous
Previous

UPCOMING TRADE SHOW

Next
Next

PODCAST: EV CHARGING INFRASTRUCTURE